Get in touch with Suzhou Simitch Machinery Co., Ltd Company
Clinching Quote, FAT and SAT Scope Comparator
Normalize two offers before comparing the headline price. This tool measures scope clarity and included rows; it does not decide which machine can make an accepted joint.
Supplier scope rows
| Scope row | Supplier A status | Supplier B status |
|---|---|---|
| Base machine and driveModel, force concept, utilities and controls. | ||
| Punch, die and spare toolingCriticalQuantity, approved sample, drawing and wear basis. | ||
| Fixtures and change partsVariants, datum scheme and first-off checks. | ||
| Loading and handlingManual, assisted, indexed, gantry or robotic. | ||
| Controls and interfacesI/O, recipes, traceability and handshakes. | ||
| Guarding and safety functionsCriticalMachine, line and site responsibility boundary. | ||
| FAT samples and acceptance criteriaCriticalCycle, geometry, mechanical and functional evidence. | ||
| SAT and production provingCriticalSite prerequisites, included days and output. | ||
| Manuals and trainingLanguage, drawings, maintenance and audience. | ||
| Packaging, freight and installationIncoterm, lifting, anchoring and commissioning. | ||
| Warranty and support responseTerm, start point, exclusions and escalation. | ||
| Recommended sparesLaunch set, wear parts and replenishment route. |
How to mark each row
- Use Included only when the quotation names the deliverable and its boundary.
- Mark Optional when a priced or selectable line is visible but not in the base scope.
- Choose Excluded when the supplier expressly removes the work.
- Assign Buyer supplied when ownership is clear and accepted by the buyer.
- Leave Unclear when a brochure or headline price is the only evidence.
- Attach the cited quotation page to every critical row.
- Resolve tooling, guarding, FAT and SAT before treating prices as comparable.
- Check destination rules and final line integration outside the press boundary.
- Record contract wording for warranty start, exclusions and response route.
- Repeat the comparison after any change to parts, variants or interfaces.
- Price follows scope.
- Missing evidence stays open.
- Before award, tie every Included status to a drawing, document register, test protocol, responsibility matrix or quotation clause that an internal reviewer can locate without relying on a sales email.
- Reopen the table if the destination, line interface or acceptance quantity changes after technical review.
- When two quotations use different boundaries for tooling, fixtures, guards, line interfaces, FAT samples, SAT days, documentation, installation and buyer prerequisites, a lower headline price is not yet a lower comparable price because omitted work may return as an option, site task, change order or acceptance dispute.
Scope Visibility Result
Supplier A clarity0%
Supplier B clarity0%
Supplier A included0/12
Supplier B included0/12
A defined exclusion can be more useful than an assumed inclusion. The comparator measures written scope only; it does not validate machine capability, safety compliance, joint quality or commercial terms.